Wisner Associates Metal Molding Matrix
| Ken Wisner | (650) 367-1234 Voice | (650) 367-1230 Fax |
| Charlie Baldwin | (408) 245-7290 Voice | (408) 404-7290 Fax |
Note: The values listed below are for
comparison only and are not absolutes.
Each project and each manufacturer is different.
Therefore, these values will vary.
~ = approximate
Back to Wisner Associates
|
Typical
Process |
Graphite
Permanent Molding |
Investment
(Lost Wax) Castings |
Precision Sand Casting |
Rubber
Plaster Molding |
Die
Casting |
Powder
Metal Parts |
Permanent
Mold |
Metal
Injection Molding |
Machining Processes |
|
Pricing: Tooling (N.R.E.) and Parts |
Tooling: $2.5K - 8K Parts: $High avg. |
Tooling $3K 10K Parts: $ High |
Tooling $800 - 4K Parts: $Average |
Tooling $1K 10K Parts: $ High |
Tooling $10K- 100K Parts: $Lowest |
Tooling $2.5K 8K Parts: $Lowest |
Tooling $3K 15K Parts: $Low avg. |
Tooling $10K - 30K Parts: $Low avg. |
Tooling $800 1.5K Parts: $Highest |
|
Quantities, Typical |
200 - 2000
|
10 - 2000 |
Under 1000
|
10 - 2000 |
2000+
|
5000+
|
300+ |
5000+ |
Under 100
|
|
Tolerances |
Average |
Above Average |
Below
Average |
Above Average |
Above Average |
High |
Above Average |
High |
Highest |
|
Metal Options |
Aluminum,
Zinc & ZA |
All metals except Tungsten |
Aluminum,
Zinc & ZA |
Aluminum,
Zinc & ZA |
Aluminum,
Magnesium, Zinc & ZA |
Many
Alloys & soft magnetics |
Aluminum,
Zinc & ZA |
Many
Alloys &
Ceramics |
All
Materials |
|
Design Freedom |
Average
|
Most |
Average |
Above Average |
Least |
Above Average |
Average |
Above Average |
Most |
|
Size Ranges Maximum |
Up to 10
lbs. |
Up to 20 lbs. |
Up to 100
lbs. |
Up to 25
lbs. |
Up to 30
lbs. |
Up to 0.5
lbs |
Up to 100
lbs. |
Up to 0.5
lbs |
All |
|
Draft Required |
Yes |
No |
Yes |
No |
Yes |
No |
Yes |
No
|
No |
|
Surface Finish, Typical |
90 - 125 RMS |
63 125 RMS |
200 250 RMS |
63 125 RMS |
63 RMS |
~20 RMS |
90 125 RMS |
~32 RMS
|
32 RMS |
|
Wall Thickness, Typical (min.) |
.100 |
.060 |
.140 |
.060 |
.045 |
~.005 |
~.140 |
~.005 |
Under
.010 |
|
Normal Delivery Times: 1st
Article Production |
3 to 6
Weeks
3 to 6
Weeks |
1 to 4
Weeks 1 to 5 Weeks |
1 to 4
Weeks 1 to 5
Weeks |
1 to 4
Weeks 1 to 5
Weeks |
10 to 16
Weeks 1 to 5
Weeks |
3 to 6
Weeks 3 to 6
Weeks |
3 to 6
Weeks 2 to 5
Weeks |
4 to 6
Weeks
4 to 6
Weeks |
1 to 2
Weeks 1 to 2
Weeks |
|
Advantages |
Great
finish, tolerances and with low cost tooling and tooling changes |
The most design
and metal options. |
Least
expensive tooling
with
reasonable
part prices |
Good die cast prototype. Great finish and design options. |
Great
finish, tolerances and piece prices |
The most
Design and Metal Options. Great finish, tolerances and piece prices |
Structurally
stronger metallurgy. Less piece price than sand casting |
The most
design and metal density. great finish, tolerances and piece prices |
The most
design and metal options. Thinnest walls and best surface finish. |
|
Disadvantages |
Limited Design options, metals and metal integrity. |
High part
price and limited size |
Rough
finish, tolerances and thick walls. Limited metal options |
High part
price and limited metal options |
Limited
design options, metals and sizes. Expensive tooling |
Larger
quantities and limited size |
More
expensive tooling than sand casting |
Tooling and Material Cost. High minimum quantities |
Very high
part price and limited quantities with time |
|
More Information
Links |
Graphite
Permanent Molding |
|
|
Copyright©2002-2009 Send comments to: Webmaster
Back to Wisner Associates